List of GUARDIANS deliverables
(Difference between revisions)
Line 281: | Line 281: | ||
|D. 6.1.4 | |D. 6.1.4 | ||
− | |[http://vision.eng.shu.ac.uk/ | + | |[http://vision.eng.shu.ac.uk/naghsh/Guardians/G_Deliverables_all/D6-1-4.doc Prototype physical and operational design of human squad member interfaces.] |
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
Line 289: | Line 289: | ||
|D. 6.1.5 | |D. 6.1.5 | ||
− | |Human robot swarm interface integration plan benchmark definition / criterion. | + | |[http://vision.eng.shu.ac.uk/naghsh/Guardians/G_Deliverables_all/D6.1.5.pdf Human robot swarm interface integration plan benchmark definition / criterion.] |
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
− | |D. 6.2.1 | + | |D. 6.2.1 |
− | |[http://vision.eng.shu.ac.uk/ | + | |[http://vision.eng.shu.ac.uk/naghsh/Guardians/G_Deliverables_all/D6-2-1.pdf Report on the conceptual design document on hierarchical hybrid scheme for global map building and localization.] |
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
Line 305: | Line 305: | ||
|D. 6.2.2 | |D. 6.2.2 | ||
− | |Report on development and implementation of the software for integrated topological map building with simulated data. | + | |[http://vision.eng.shu.ac.uk/naghsh/Guardians/G_Deliverables_all/D6-2-2andD6-2-3.pdf Report on development and implementation of the software for integrated topological map building with simulated data.] |
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
Line 313: | Line 313: | ||
|D. 6.2.3 | |D. 6.2.3 | ||
− | |Report of the validation of software of the algorithms on environmental gloabl map building and up-dating and simulated data. | + | |[http://vision.eng.shu.ac.uk/naghsh/Guardians/G_Deliverables_all/D6-2-2andD6-2-3.pdf Report of the validation of software of the algorithms on environmental gloabl map building and up-dating and simulated data.] |
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
Line 321: | Line 321: | ||
|D. 6.3.1 | |D. 6.3.1 | ||
− | | | + | | Interaction schemes analysis and specification (Robots <-> Base Station Operators + Human Squad Members <-> Base Station Operators) |
− | |align="center"| | + | |align="center"|RE |
|- | |- | ||
Line 331: | Line 331: | ||
|Base station design and implementation | |Base station design and implementation | ||
− | |align="center"| | + | |align="center"|RE |
|- | |- | ||
Line 339: | Line 339: | ||
|Base station Integration plan and benchmark definition / criterion | |Base station Integration plan and benchmark definition / criterion | ||
− | |align="center"| | + | |align="center"|RE |
|- | |- | ||
Line 347: | Line 347: | ||
|Report on integration testing | |Report on integration testing | ||
− | |align="center"| | + | |align="center"|PP |
|- | |- | ||
Line 355: | Line 355: | ||
|Report on testing and evaluation of GUARDIANS | |Report on testing and evaluation of GUARDIANS | ||
− | |align="center"| | + | |align="center"|PP |
|- | |- | ||
Line 363: | Line 363: | ||
|[http://www.robot.uji.es/documents/rise08/ Workshop Year 1 and Proceedings] | |[http://www.robot.uji.es/documents/rise08/ Workshop Year 1 and Proceedings] | ||
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
Line 369: | Line 369: | ||
|D. 9.4 | |D. 9.4 | ||
− | |Workshop Year 2 and Proceedings | + | |[http://www.robot.uji.es/research/events/rise09 Workshop Year 2 and Proceedings] |
− | |align="center"| | + | |align="center"|PU |
|- | |- | ||
Line 377: | Line 377: | ||
|D. 9.5 | |D. 9.5 | ||
− | |Workshop Year 3 and Proceedings | + | |[http://www.falconguard.info/rise10/ Workshop Year 3 and Proceedings] |
− | |align="center"| | + | |align="center"|PU |
|} | |} |
Revision as of 12:36, 16 July 2010
A Full list of the deliverables for the Guardians project.
The list below will link to online documentation representing deliverables as and when it becomes available.
Deliverable No | Deliverable Title | Dissemination level |
---|---|---|
Annexe | [Annexe Latest version (edited 16/12/08)] | RE |
D 1.1/2 | Description of the Warehouse search scenario; User Requirements Document | PU |
D 1.3 | Report: Human robot swarm interaction requirements | PU |
D 2.1.1 | Compiled list of recommended sensors and sensor-carriers (robots) | PU |
D 2.1.2 | Reference guidelines for implementing a standard interface in a set of modular sensors | PU |
D 2.1.3/4 | The navigation capabilities of the robot platforms for the selected scenario and common API specifications for the robot platforms | PU |
D 2.2.1 | The sensor array for registration of electrocactive gaseous analytes | PP |
D 2.2.2 | ANN embedded system for the recognition and concentration evaluation of different gases. | PP |
D 2.2.3 | Operational sensor array with ANN system implemented on robot platform. | PP |
D 2.2.4 | Advanced olfactory system for operation in fire scenarios. | PP |
D 2.2.5 | Reference algorithms for estimating risk maps in fire scenarios. | PU |
D. 2.2.6 | Report on sensors for navigation, localization and mapping. | PU |
D. 2.3.1 | Simulated environment for navigation tasks. | PP |
D. 2.3.2 | Evaluation on simulation of sensors and algorithms for navigation and localization tasks | PP |
D. 2.3.3 | Navigation and localization implemented on robot platform. | PP |
D. 3.1 | Specification of search and navigation logic. | RE |
D. 3.2 | Characterization of wireless communication techniques for robot networks. | RE |
D. 3.3 | Specification of a communication protocol for ad-hoc networking for static and mobile nodes. | RE |
D. 3.4 | Specification of a control and coordination structure for the robot system. | RE |
D. 3.5 | Communication infrastructure (hardware and software) for ad-hoc networking. | RE |
D. 3.6 | List of swarm behaviours and characterization for use in the proposed application scenarios. | RE |
D. 3.7 | Library of basic behaviours for a single robot to enable swarm behaviour of a group of robots. | RE |
D. 3.8 | Implementation of the swarming algorithms. | RE |
D. 3.9 | Simulator environment for analyzing non-communicative and communicative swarming. | RE |
D. 3.10 | Swarming of a real robot system. | PU |
D. 4.1 | Preliminary System Architectural Design (PSAD - Based on ESA Standard Template). | RE |
D. 4.2 | Software Architecture (SA - Based on ESA Standard Template). | RE |
D. 4.3 | UML Control Architecture: System Architecture diagram, Use case diagrams, Class diagrams, Activity diagrams, State diagrams, Sequence diagrams, Constraints diagram, Concurrency diagram. | RE |
D. 4.4 | RT-Linux development environment. | RE |
D. 5.1 | GUARDIANS prototype. | PU |
D. 5.2 | Report on technical and functional tests. | RE |
D. 6.1.1/2 | Conceptual design document for human-robot swarm. Interaction schemes analysis and specification. | PU |
D. 6.1.3/6.3.2 | Detail of the request/status data/information flow between the agents and the base station and operator and base station. | PU |
D. 6.1.4 | Prototype physical and operational design of human squad member interfaces. | PU |
D. 6.1.5 | Human robot swarm interface integration plan benchmark definition / criterion. | PU |
D. 6.2.1 | Report on the conceptual design document on hierarchical hybrid scheme for global map building and localization. | PU |
D. 6.2.2 | Report on development and implementation of the software for integrated topological map building with simulated data. | PU |
D. 6.2.3 | Report of the validation of software of the algorithms on environmental gloabl map building and up-dating and simulated data. | PU |
D. 6.3.1 | Interaction schemes analysis and specification (Robots <-> Base Station Operators + Human Squad Members <-> Base Station Operators) | RE |
D. 6.3.3 | Base station design and implementation | RE |
D. 6.3.4 | Base station Integration plan and benchmark definition / criterion | RE |
D. 7.1 | Report on integration testing | PP |
D. 7.2 | Report on testing and evaluation of GUARDIANS | PP |
D. 9.3 | Workshop Year 1 and Proceedings | PU |
D. 9.4 | Workshop Year 2 and Proceedings | PU |
D. 9.5 | Workshop Year 3 and Proceedings | PU |